Texas Power Play: Hut 8 Sparks a $9.8B AI Infrastructure Deal
Hut 8 signed a 15-year, $9.8 billion triple-net lease at its Beacon Point Texas campus, doubling contracted capacity to 704 megawatts and shifting its model toward AI data center infrastructure.
Read the full story at MarketBeat News Feed →