Chevron Panama Solar Project Breaks Ground at Colón Fuel Terminal
Chevron laid the first stone for a 4.03 MWp solar plant at its Bahía Las Minas fuel terminal in Colón on 20 August 2026. Built with Celsia, it will generate about 5.15 GWh a year and cover all the terminal's power needs. The post Chevron Panama Solar Project Breaks Ground at Colón Fuel Terminal appeared first on The Rio Times .
Read the full story at The Rio Times →